Expert 518639 - CA(S)

Expertise Description

I have more than 35 years of experience in Architecture with expertise in construction pricing, materials, and methods. I have been involved in a variety of commercial, industrial and institutional projects which include retail, office buildings, mid to high-rise residential, hospitals, schools, laboratories, hotels, airports, as well as a variety of Federal buildings and facilities. My professional skills include cost management, conceptual estimating, as well as estimating and cost planning, project management, scheduling and change orders, medication, and the development of strategies. I have over 35 years of expert witness experience with consultations, deposition, and courtroom testimony.

Expert 503583 - AZ TX

Expertise Description

I have more than 35 years of experience in the field of Civil Engineering Design with expertise in Project Management, Construction Management, and Construction. My civil engineering design experience ranges from the design of grading, drainage and utilities for small commercial/retail projects to residential subdivisions, multi-family and mixed-use developments and institutional campuses such as universities, schools, and medical Centers. Also prevalent in my civil design and Project Management experience is public works projects including street, highway, bridge and drainage related facilities improvements, water, sewers and sewer system design. My Project Management and Construction Management experience includes the aforementioned project types as well as substantial experience with coal fired electric generating plants, strip mines railroads and dams associated therewith. I also have experience with the construction of natural gas pipelines and compressor stations. Early in my career, I was a field engineer working for a general contractor on a major wastewater plant expansion. For over 10 years, I have owned and operated a heavy construction company involved with a wide variety of projects as described above, including work on major electrical substations and within power plants. I have over 15 years experience with consultation, deposition, and courtroom testimony.

Expert 161329 - IL

Expertise Description

I have over 50 years of experience in the construction industry with extensive experience in construction management and procedures, quality assurance, building envelope defects and failures, construction testing and evaluation, building envelope issues, concrete inspections, welding inspections, concrete pavement, concrete slabs, and quality control. I have more than 25 years expert witness experience with consultations, deposition, and courtroom testimony.

Expert 351554 - CT NJ NY PA

Expertise Description

I have more than 40 years experience in the field of Civil Engineering with expertise in Forensic Engineering. I have experience with Construction Management for large public works projects; heavy construction, buildings, schools, highways, wastewater treatment plants, LNG bus garages, and landfills. I have been an engineering consultant to sureties for surety issues, construction bond matters, building movement, building envelope defects, codes, construction disputes, and have provided engineering investigations into construction accidents, defects, and damage. I have over 5 years expert witness experience with consultation, deposition, and courtroom testimony.

Expert 326943 - CA(N)

Expertise Description

I have more than 30 years experience in Construction Law, including experience with all phases of engineering and construction contracting, design, bidding, change orders and claims preparation, errors and omissions claims, mechanic's liens and bond claims, public and private work, litigation and alternative dispute resolution; insurance claims and disputes regarding design and construction coverage; and arbitration, mediation and other forms of ADR. I have diverse project experience ranging from large civil industrial and commercial projects to failed real estate development projects and construction defect litigation, and have established working relationships with the top consultants in these areas. I have experience representing owners, developers, contractors and design professionals both as plaintiffs and as defendants. My areas of expertise also include sales of goods, business torts, insurance coverage, and real estate development, including related financial services.

Expert 342800 - CA(S)

Expertise Description

I have more than 40 years experience in Design and Construction. I have experience designing large scale projects including: commercial, industrial, residential, motion picture and television studios, research & development facilities, health care facilities, public buildings, as well as restoration of historically significant structures. My areas of expertise include ADA compliance, disabled access, due diligence, development entitlements, building department processing/approval, code research, damage assessment, change order evaluation, contract disputes, construction failures, construction accidents, standard of care performance, professional performance review, construction mistakes and deletions, construction standards, building code corrections, roof leaks, roof failures, delayed construction, change order claims, construction documents review, project files examination, architectural and construction forensic opinions on existing, remodeled or proposed new project construction projects. I have prior expert witness experience with consultations, deposition, and courtroom testimony.

Expert 393459 - CA(S)

Expertise Description

I have more than 35 years experience in the field of Construction. I have experience with such construction projects as subways and transit stations, highways, a variety of bridges and interchanges, water and waste water treatment plants, marine structures including piers and wharfs, high-rises, and various other building structures. My areas of expertise include
Troubled Project Turn Around, Project Management, Constructability Reviews, Design/Engineering Reviews, Architect/Engineer Selection, Contract Reviews, Pre-Construction Services, Review of Bid Packages, Cost Estimating, Project Procedures, Risk Management, Project Cost Controls, Project CPM Scheduling, Change Order Management, Job Progress Evaluation, Claims Mitigation, and Project Close-out.

Expert 463127 - CA(N) CA(S)

Expertise Description

I have more than 40 years experience in the field of General Contracting with expertise in practical solutions to building performance issues. I have experience with foundation repair, seismic retrofitting, testing and evaluation of fire and water damage. The scope of services I am typically asked to provide includes investigation, destructive testing, windows installation, repair recommendation development, construction procedures, cost estimation, and presentation of findings in cases of construction defects, building envelope defects, insurance coverage, bad faith, failure to disclose, fraud, and criminal negligence and project mismanagement. I have over 10 years expert witness experience with consultations, deposition, and courtroom testimony.

Expert 50828 - AZ CA(N) CA(S) NV

Expertise Description

I have more than 40 years experience in the field of Construction Forensics with expertise in residential and commercial inspections. I have additional knowledge in all phases and trades of construction, including: Americans with Disabilities Act (ADA), site-work, concrete, masonry, framing, waterproofing, insulation, roofing, flashing and sheet metal, door & windows, flooring (all types), lath & plaster, gypsum board (drywall), acoustic treatment, painting, ceramic tile, mechanical, electrical, steel, fencing, and furniture fixtures, and equipment. I have over 20 years expert witness experience with consultations, deposition, and courtroom testimony.

Expert 454980 - AL AK AZ AR BC CA(N) CA(S) CO CT DE DC FL GA HI IA ID IL IN KS KY LA ME MD MA MI MN MS MO MT NE NV NH NJ NM NY NC ND OH OK OR PA QC RI SC SD TN TX UT VT VA WA WV WY WI

Expertise Description

I have more than 35 years experience in the field of Construction and Real Estate with expertise with contract interpretation, construction testing and evaluation, bonding and surety issues, construction failures, financial damages, personal injury accidents, multi-contract coordination and scheduling; environmental protection, contract preparation, urban planning and zoning controversies, claims and loss damages, and applications; and residential subdivision and commercial development applications and approvals. I have additional experience with construction projects in residential high-rise, office high-rise, hospitals, research laboratories, correctional facilities, schools and universities, theaters, and museums. I have more than 5 years experience with consultations, deposition, and courtroom testimony.

Expert 323643 - CA(N) HI

Expertise Description

I have more than 40 years experience in the field of Construction with expertise in project management, pre-construction, design build and hard bid, estimating, contractor delay claims, contract administration and negotiation, contractual dispute, conflict resolutions, logistics, scheduling, field operations, site safety, production, cost control, commissioning, OSHA regulations, and closeout. I have knowledge in Heavy Commercial, Structural, Concrete Slabs, Cast-in-Place Concrete construction, with substantial background in Civil work, Structural Steel, Seismic Retrofit, most MEP installations and all Finishes as well as journeyman level knowledge in multiple trades (concrete, rough & finish carpentry, electrical, drywall and painting). I have over 25 years expert witness experience with consultations, deposition, and courtroom testimony.

Expert 392771 - OR

Expertise Description

I have more than 45 years experience in the field of Construction with expertise in construction dispute, claims and litigation, contract agreements and documents, project management, construction management, labor consulting, project constructability, project cost overruns, contract time delays, and quality control. I have additional knowledge of safety issues, general building and heavy engineering contracting, cost eliminating, subcontracting, labor production, project acceleration, change orders, and contracts and agreements. I also have experience with Critical Path Method (CPM) planning and scheduling, Earthwork and Site-Work, forensic analysis, and wastewater reclamation projects. I have over 40 years expert witness experience with consultations, deposition, and courtroom testimony.

Expert 381187 - BC CA(S)

Expertise Description

I have more than 30 years experience in the field of Architecture and Construction. My experience includes contract drawings and specifications with an emphasis on technical quality, project management, architectural evaluation, facility assessments, construction management, project scheduling, water intrusion and envelope failure, construction delays, architectural issues, mold issues, building envelope issues, and construction claims. My architectural experience has involved many types of buildings, including commercial architecture, bus shelters, recreational centers, wood frame apartments, high-rise buildings, correctional facilities, educational buildings, major civic buildings, and several family homes. I have experience in construction administration. I have case experience in construction defects, fire investigation, construction delay claims, construction contract administration, and litigation avoidance.

Expert 374629 - CA(S)

Expertise Description

I have over 20 years broad based development experience in the field of construction. My primary focus consists of corporate level management as well as development team management at the project level, taking project from the infant stages of acquisition, through design and development, to completion and turnover. My experience includes field engineer, officer engineer, project engineer, design and construction manager, superintendent, project manager, director of development and construction. My consultations further include pre-acquisition and pre-construction feasibility, change order and claims preparation, cost estimating, financial damages, planning, organization, leadership, control, and administration. I have prior expert witness experience.

Expert 341985 - NY

Expertise Description

I have over 25 years experience in various engineering and construction capacities. My experience and work assignments include various aspects of the main disciplines of Engineering and Environmental consulting including but not limited to: building sites; building and safety codes compliance; facility assessments; cost of repair; windows installation; construction and project management; carbon monoxide formation; physical condition surveys; reserve funding analysis; thermal expansion and contraction; plumbing; electrical; heating, ventilating, and air conditioning design inspection and evaluation; and preparation of contract documents and specifications for repairs and restoration of buildings and site items. I have more than 20 years expert witness experience with consultations, deposition, and courtroom testimony.