Expert 372241 - NY

Expertise Description

My career has spanned more than 35 years in Construction Costs with an expertise in cost estimating and cost control, proposal analysis, value engineering, scheduling, and project management experience on a wide variety of projects including residential, commercial and office buildings, public schools, colleges, universities, institutional, restorations, public buildings, high rise, site development, transportation and heavy construction projects. I have experience in cost consulting at all stages of design and have performed value engineering on many projects, including schools, colleges, public buildings, hospitals, courthouses, detention facilities, water pollution control plants, bridges, tunnels, and various infrastructure projects. I have also spent over a decade offering consultations, deposition, and courtroom testimony as a construction costs expert witness experience in New York.

Expert 518990 - CA(S)

Expertise Description

My background of over 45 years as an Architect has been focused on standard of care, construction documents, architectural design and constructability, coordination, delay, construction disputes, contracts, code compliance, land use, and zoning. I have international experience on complex, multimillion dollar projects, including commercial, mixed-use, retail, office, hotel, and institutional. With more than 5 years experience as architect expert witness in Southern California, I have provided consultations and deposition, in addition to courtroom testimony.

Expert 393410 - CA(S)

Expertise Description

My career has spanned more than 30 years in electrical design and construction of commercial, residential, biomedical, light industrial and institutional facilities. I have been responsible for preparation of electrical contract documents for both consulting engineering firms and design/build contractors. My areas of expertise include residential and commercial high-rise buildings, office campus environments, medium-voltage (15 KV) and (600 Volt) power distribution systems, lighting design and control systems and low-voltage signal systems. I also have experienced with the utilization of IPD (Integrated Project Delivery) construction delivery methods, including BIM (5D), three-dimensional modeling with estimating and scheduling parametrics.

Expert 518639 - CA(S)

Expertise Description

I have more than 35 years of experience in Architecture with expertise in construction pricing, materials, and methods. I have been involved in a variety of commercial, industrial and institutional projects which include retail, office buildings, mid to high-rise residential, hospitals, schools, laboratories, hotels, airports, as well as a variety of Federal buildings and facilities. My professional skills include cost management, conceptual estimating, as well as estimating and cost planning, project management, scheduling and change orders, medication, and the development of strategies. I have over 35 years of expert witness experience with consultations, deposition, and courtroom testimony.

Expert 515458 - GA

Expertise Description

I have more than 15 years of experience in the field of Construction as a Professional Engineer in multiple states. I instruct on the subjects of Construction Management and Science with teaching interest in structural engineering with regard to steel, concrete, timber, wind loads, and seismic loads; MEP design and analysis; construction project management with regard to scheduling, estimating, and strategic bidding; capstone, and Building Information Modeling (BIM). I am published in my field and also provide presentations. I have over 5 years of expert witness experience with consultations, deposition, and courtroom testimony.

Expert 368346 - AL CA(N) CA(S)

Expertise Description

I have been involved in the construction industry for over 35 years. My business focuses on the public sector programs and construction management services. I oversee the daily operations and financial responsibilities of the corporation and provide leadership for a diverse range of public projects, with a focus on K-12 Public School Districts. I also provide principal oversight on all the corporations’ projects, as well as provide general planning and program management services. My business has assisted over fifty (50) K-12 school districts with bond planning, facility assessments, programming, constructability (plan) reviews, detailed budgets and cost estimates, funding assistance, and construction project management services. I have also assisted Districts and their legal counsel in analyzing conflicts, turning around troubled projects and resolving disputed issues, including construction related defects and claims, contractual disputes, best practices and industry specific roles and responsibilities. I have provided services as a mediator and arbitrator. I have over 10 years of expert witness experience with consultation, deposition, and courtroom testimony.

Expert 505119 - NJ NY

Expertise Description

I have more than 25 years experience in the field of Construction with expertise in evaluating general construction related issues and deficiencies. I am a specialist in evaluating water intrusion related construction issues. I have designed solutions to resolve construction problems in residential and commercial structures, and have experience with construction damage analysis and various slips and fall accidents and have researched applicable building codes and standards connected to these accidents. I have over 15 years expert witness experience with consultations, deposition, and courtroom testimony.

Expert 504868 - CA(S)

Expertise Description

I have more than 30 years experience in Architect with expertise in the fields of institutional, hospitality, medical, and commercial designs. I have particular experience in architectural evaluation, architectural assessment, renovation, and adaptive reuse. My architecture expertise includes design, construction documents, construction administration, cost estimating, computer modeling, specifications, interior design, tenant improvements, and model and rendering preparations. I also have experience planning including pre-entitlement analysis, land planning, programming, feasibility studies, development cost analysis, project scheduling, and site selection studies. I have prior expert witness experience with consultations and deposition.

Expert 326834 - AZ CA(N) CA(S) CO NV

Expertise Description

I have more than 30 years experience with Construction Disputes & Public Bids. My expertise includes complex construction disputes in state and federal courts, including: mechanics’ lien; stop notice; surety bond; Miller Act claims; delay; disruption; default; personal injury; defect and policyholder insurance coverage claims; and public bidding process. I have prior expert witness experience with consultations, deposition, and courtroom testimony.

Expert 52026 - CA(S)

Expertise Description

I have more than 30 years of experience in construction as a Licensed Insurance Adjuster, Real Estate Agent, and General Contractor. My expertise includes Construction Defects. I have experience with forensic damage assessment, wood repair, and replacement costs. My additional experience includes residential and commercial construction and consulting. I have over 15 years expert witness experience.

Expert 128245 - FL

Expertise Description

I have over 30 years experience in real estate and litigation consulting. I have expertise in calculation of real estate damages resulting from construction delays, insurance claims, temporary takings, eminent domain, due diligence, and commission disputes. My expertise also includes: conducting market, marketability, and financial feasibility studies encompassing all aspects of real estate development (residential, office, retail, resort, and industrial properties); acquisition and investment analysis; highest and best use analysis; and adaptive re-use. I have experience in broker standard of care, commission disputes, broker responsibilities, broker malpractice, and broker ethics. I have more than 25 years expert witness experience with consultations, deposition, and courtroom testimony.

Expert 128476 - NJ

Expertise Description

I have over 40 years experience in Construction, Site-Work, Earthwork, Heavy Equipment, Grading, Underground Utilities, Construction Claims, Construction Delays, Change Order and Claims Preparation, Construction Equipment, and Construction Safety. I have more than 5 years expert witness experience with consultations, deposition, and courtroom testimony.

Expert 320882 - CA(N) CA(S) NV

Expertise Description

I have over 25 years experience in the field of architecture and am a Licensed Architect in California and Nevada. My expertise includes: environmental control systems; real estate development; mixed-use design and construction; residential architecture (new construction & remodeling); commercial architecture / design (offices, restaurants, medical offices); project management; and building code compliance. I have prior expert witness experience with consultations, deposition, and courtroom testimony.

Expert 51131 - CA(N)

Expertise Description

I have over 30 years experience in commercial and residential construction, repair, remodeling, and claims. My expertise includes: construction management; financial analysis; forensic analysis of design- and construction-related subjects; delay analysis; scheduling; means and methods; preservation / restoration; cost / time estimation; structural repair of damages as a result of fire, water, and wind. I have prior expert witness experience consultations, deposition, and courtroom testimony.

Expert 48888 - CA(N)

Expertise Description

I have over 30 years experience as a civil engineer specializing in roofing issues, including laboratory analysis; inspections; building envelopes; roof management; roofing failures; moisture surveys; waterproofing; roof coatings; reroofing; leak investigation / analysis; ventilation / condensation; wind damage; fastenings; construction documents / monitoring; and insurance and legal claims. I also specialize in hurricane, earthquake, fire, and hail damage. My additional experience includes façade, concrete, and masonry failures, in addition to foundations, retaining walls, and anchors. I have expertise in construction management, scheduling, marketing, and training. I have more than 30 years expert witness experience with consultations, deposition, and courtroom testimony.

Expert 51241 - CA(S)

Expertise Description

I have 30 years experience in the construction industry with general contracting and consulting as a civil engineer, general contractor, and realtor. My background includes public works, libraries, commercial facilities, retail buildings, restaurants, residential projects, high rise residential buildings, and educational complexes, including surveying, structural design, structural performance, subdivision design, grading, street improvements, sewers, storm drains, and storm drain channel systems, as well as project management, time impact analysis, contract administration, scheduling, staff training, and O.S.H.A. My consulting / claims experience includes: mediation; claim preparation; litigation support; document research and analysis; contractual disputes; and claims avoidance advising. I have more than 10 years expert witness experience.

Expert 52044 - FL NY

Expertise Description

I have over 35 years experience in the field of Civil Engineering. My expertise includes construction, engineering assessments, civil engineering, forensic engineering, and value engineering. I have extensive experience in architecture, construction management, project management, program management, forensic evaluations, design-build integration, constructability, estimating, landscaping, premises liability, value management, geotechnics, foundations, planning / scheduling, and quality assurance in private and public projects, including recreation and waterfront / marine facilities, in addition to mass transit, and airports. I have additional experience with bridges, long span bridges, suspension bridges, cable stay bridges, steel bridges, segmental concrete, and concrete arch. I have more than 5 years expert witness experience.

Expert 47022 - CA(S) NV OR

Expertise Description

I have over 20 years of professional experience in architecture specializing in commercial architecture and residential architecture, forensic architectural issues, architectural standard of care, and water intrusion failure analysis. My other areas of expertise include contractor delay claims, Americans with Disabilities Act (ADA), ADA analysis, mold remediation repairs, and course of construction claims disputes. I have more than 15 years expert witness experience with consultations, deposition, and courtroom testimony.

Expert 45961 - CA(N)

Expertise Description

I have over 25 years experience in the construction industry. My areas of expertise include: construction defects; cost estimating; project preparation; project controls; contracts; CPM scheduling (including cash flow analysis); construction and project management; detailed cost analysis; building materials; physical construction, build-out, and retro-fit of single-family and multi-family residential, commercial/retail space, industrial construction, manufacturing process plants and sites, engineering facilities, schools, hospitals, and clinics. I have more than 15 years expert witness experience with consultations, deposition, and courtroom testimony.

Expert 11121 - AZ CA(N) CA(S) CO HI NV TX WI

Expertise Description

I have over 45 years experience in architecture as a firm owner and principal including facilities evaluations, development of remedial programs, project design, and management. I have worked on a variety of projects ranging from residential, commercial architecture, facility assessments, academic, industrial, sporting, architecture of parking structures, and event structures. I have been a designer and principal-in-charge of a significant number of noteworthy projects. My additional expertise includes architectural building evaluations / conditions reports, architectural assessment, building sites, programs, and building husbandry. I have more than 30 years expert witness experience with consultations, deposition, and courtroom testimony.

Expert 42079 - CA(S) TX

Expertise Description

I have with more than 40 years experience in the field of Construction. My expertise includes commercial and industrial construction including contract management, mediation, estimating, scheduling, claims, and due diligence. I am also knowledgeable in computer systems, software, and applications development involving Oracle, Informix, Unix, AIX, Sun, and Solaris, as well as, integration, implementation, analysis, and design. I have over 5 years expert witness experience.

Expert 169205 - CA(S) NV

Expertise Description

I have more than 35 years experience in the field of Commercial Construction. I am the Founder and President of a general contractor and commercial real estate developer. My projects include: commercial and industrial buildings; retail stores and shopping centers; cost of repair; manufacturing facilities and corporate headquarters; office and medical buildings; self-storage mini-warehouses; tenant improvements and renovations; and off-site street improvements and land developments. In addition, I have built and remodeled custom homes and apartment projects. As a commercial real estate developer, I have participated as a principal or manager in the ownership, investment, development, acquisition, financing, planning, design, construction, and management of over 1,500,000 square feet of commercial, industrial, and office projects. I have over 15 years expert witness experience with consultations, deposition, and courtroom testimony.

Expert 28390 - AZ

Expertise Description

I have over 40 years of construction experience as a civil engineer. My areas of expertise include: heavy construction management, heavy construction estimating, heavy construction bidding, cost control, project scheduling, crew productions, claim preparation and negotiating, as well as construction systems engineering. I have more than 10 years expert witness experience with consultations, deposition, and courtroom testimony.

Expert 28211 - NY

Expertise Description

I have over 45 years experience in construction, architecture, and urban design issues, including commercial construction, commercial property development, commercial property construction, residential development, urban planning & development, suburban development, project management, construction management, scheduling, codes & standards, claims, arbitration, damages, disputes, safety, procedures, architectural design, architectural standards, architectural assessment, architectural codes & compliance. I have more than 10 years expert witness experience.

Expert 18774 - WA

Expertise Description

I have over 30 years experience in construction, including contract analysis, CPM preparation, claim preparation, settlement negotiation, business analysis, and construction management.

Expert 12262 - CA(S)

Expertise Description

I am a Building Contractor and Inspector with over 40 years of hands-on field experience. My areas of expertise include defective construction analysis, cost estimating, and construction scheduling and delays, as well as; plan and code compliance, document analysis, summaries and reports, evaluation of change order costs; estimates of repair for property loss from fire, flood, water and earthquake damage; construction management, on-site inspections, and project supervision.

Expert 8945 - AZ CA(N) HI OK TX UT

Expertise Description

I have over 40 years experience in architecture and construction as a principal planner and designer specializing in various types of building structures. My expertise includes project management, facilities programming, planning/urban design & public hearings, contract documents and coordination, specifications & material research, cost estimating & project scheduling, and construction contract administration. I have more than 25 years expert witness experience with consultations, deposition, and courtroom testimony.

Expert 8879 - CA(N) CA(S)

Expertise Description

I have over 50 years experience in professional estimating issues. My areas of expertise include definitive estimates, hard bid estimating, change order and claims settlements, and value engineering. I have more than 25 years expert witness experience with consultations, deposition, and courtroom testimony.

Expert 8876 - CA(S)

Expertise Description

I have over 40 years experience in general contracting and construction. I am knowledgeable in all phases of construction. My areas of expertise include: construction defect investigation involving residential and commercial structures – concrete, framing, dirt, dry wall, HVAC, electrical, safety, destructive testing; litigation and claims support; construction operations analysis; estimating and budgets; land acquisition; as well as, construction management and project feasibility. I have more than 15 years expert witness experience with consultations, deposition, and courtroom testimony.

Expert 8874 - NV

Expertise Description

I have over 40 years experience in the construction industry, including project management and cost engineering issues. My areas of expertise include construction management, cost control, cost estimating, design / construction issues, value analysis, and project control. I have more than 10 years expert witness experience with consultations, deposition, and courtroom testimony.

Expert 8858 - CA(N) CA(S) NV OR WA

Expertise Description

I have over 30 years experience in design, field engineering, and construction and project management in power and industrial plants and heavy construction. My expertise includes construction contract formation and administration, development, and analysis of claims and construction problems including delays, errors and change orders, terminations, etc. I have specific experience in design and construction of electric power plants and industrial boilers including steam and combined cycle turbines, piping, valves, hydraulics and thermal problems, pumps, heat exchangers, and similar equipment. I have more than 20 years expert witness experience with consultations, deposition, and courtroom testimony.

Expert 500432 - AL AK AZ AR BC CA(N) CA(S) CO CT DE DC FL GA HI IA ID IL IN KS KY LA ME MD MA MI MN MS MO MT NE NV NH NJ NM NY NC ND OH OK OR PA QC RI SC SD TN TX UT VT VA WA WV WY WI

Expertise Description

I have more than forty years of experience in the Engineering-Construction industry, ranging from laborer to engineering-construction unit executive management. In addition to construction contract dispute resolution services, I work with youth, dislocated workers, and veterans’ workforce development programs. I have worked on very large infrastructure, contract preparation, industrial and institutional projects, as well as on more modest-sized tourist resort complexes, residential properties and government buildings and facilities in the U.S. and more than twenty-five countries around the world. The bulk of this experience has been gained with large construction organizations. I can assist in the evaluation and resolution of construction contract dispute claims. I have over 15 years expert witness experience with consultation and deposition.

Expert 500858 - MO

Expertise Description

I have many years experience in the field of Construction Management with expertise in Facilities Management, Development Consulting, and Project Scheduling Services. I have experience with plan reviews, cost estimate reviews, interpreting and applying local and national building and zoning codes, and performing inspections with property owners, architects and contractors. I have over 25 years expert witness experience with consultations, deposition, and courtroom testimony.

Expert 393459 - CA(S)

Expertise Description

I have more than 35 years experience in the field of Construction. I have experience with such construction projects as subways and transit stations, highways, a variety of bridges and interchanges, water and waste water treatment plants, marine structures including piers and wharfs, high-rises, and various other building structures. My areas of expertise include
Troubled Project Turn Around, Project Management, Constructability Reviews, Design/Engineering Reviews, Architect/Engineer Selection, Contract Reviews, Pre-Construction Services, Review of Bid Packages, Cost Estimating, Project Procedures, Risk Management, Project Cost Controls, Project CPM Scheduling, Change Order Management, Job Progress Evaluation, Claims Mitigation, and Project Close-out.

Expert 395842 - CA(S)

Expertise Description

I have more than 20 years experience in Construction as a Civil Engineer. I have experience with managing the project controls and claims on public, commercial, and construction projects. I have additional expertise in project scheduling, claim analysis, negotiations, and resolution, cost estimating and controls. My areas of expertise include productivity analysis and improvement, and reengineering business processes.

Expert 400050 - CA(N)

Expertise Description

I have over 40 years experience in Construction specializing in construction planning, CPM scheduling, estimating and project management experience, including schedule review and acceleration to meet key milestones. I am skilled in delay analysis and claims preparation including crafting creative solutions to complex technical construction problems. I also have arbitrator experience in estimating on conceptual and hard bid projects including finalizing all subcontractor quotes and final price on bid day. I have additional knowledge of activities management from small private works to multi-million dollar public works projects, including awarding subcontracts, requesting time extensions and managing change orders.

Expert 438227 - CA(S)

Expertise Description

I have over 40 years experience in the field of Real Estate Development and Construction. I have experience with managing operation and design, site planning, budgeting, scheduling, construction management processes, site selection, site inspections, budget monitoring, progress payments, accounting. I also have extensive experience in real estate development and construction. I have aided numerous U.S., State, and local government agencies on public improvement projects including, construction of streets, water, sewer, power, gas, traffic signals, and related infrastructure.

Expert 454980 - AL AK AZ AR BC CA(N) CA(S) CO CT DE DC FL GA HI IA ID IL IN KS KY LA ME MD MA MI MN MS MO MT NE NV NH NJ NM NY NC ND OH OK OR PA QC RI SC SD TN TX UT VT VA WA WV WY WI

Expertise Description

I have more than 35 years experience in the field of Construction and Real Estate with expertise with contract interpretation, construction testing and evaluation, bonding and surety issues, construction failures, financial damages, personal injury accidents, multi-contract coordination and scheduling; environmental protection, contract preparation, urban planning and zoning controversies, claims and loss damages, and applications; and residential subdivision and commercial development applications and approvals. I have additional experience with construction projects in residential high-rise, office high-rise, hospitals, research laboratories, correctional facilities, schools and universities, theaters, and museums. I have more than 5 years experience with consultations, deposition, and courtroom testimony.

Expert 323643 - CA(N) HI

Expertise Description

I have more than 40 years experience in the field of Construction with expertise in project management, pre-construction, design build and hard bid, estimating, contractor delay claims, contract administration and negotiation, contractual dispute, conflict resolutions, logistics, scheduling, field operations, site safety, production, cost control, commissioning, OSHA regulations, and closeout. I have knowledge in Heavy Commercial, Structural, Concrete Slabs, Cast-in-Place Concrete construction, with substantial background in Civil work, Structural Steel, Seismic Retrofit, most MEP installations and all Finishes as well as journeyman level knowledge in multiple trades (concrete, rough & finish carpentry, electrical, drywall and painting). I have over 25 years expert witness experience with consultations, deposition, and courtroom testimony.

Expert 447812 - CA(N)

Expertise Description

I have more than 35 years experience in the field of Civil Engineering and Construction Management. My scope of expertise includes construction standard of care, schedule disruption, labor productivity issues, labor management / organization, delay and acceleration, injuries, project planning, and control systems. Additional industry experience involves engineering-construction, technology, petrochemical, military, education, and manufacturing projects, and I am highly familiar with construction-related disputes, means and methods, cost issues, design management, productivity studies, subcontract administration, and profit and loss. I have over 20 years expert witness experience with consultations, depositions, and courtroom testimony.

Expert 443066 - KY NY

Expertise Description

I have more than 25 years experience in the fields of Civil and Structural Engineering. My expertise includes structural analysis, structural design,structural performance, environmental engineering, masonry design, wood design, and project management. I have additional knowledge in alternative energy efficient designs, solar heating and cooling, trenchless technologies for pipeline rehabilitation in gas distribution networks, and seismic performance of Masonry and Masonry veneer. I have over 10 years expert witness experience with consultations, deposition, and courtroom testimony.

Expert 381187 - BC CA(S)

Expertise Description

I have more than 30 years experience in the field of Architecture and Construction. My experience includes contract drawings and specifications with an emphasis on technical quality, project management, architectural evaluation, facility assessments, construction management, project scheduling, water intrusion and envelope failure, construction delays, architectural issues, mold issues, building envelope issues, and construction claims. My architectural experience has involved many types of buildings, including commercial architecture, bus shelters, recreational centers, wood frame apartments, high-rise buildings, correctional facilities, educational buildings, major civic buildings, and several family homes. I have experience in construction administration. I have case experience in construction defects, fire investigation, construction delay claims, construction contract administration, and litigation avoidance.

Expert 321797 - CA(S)

Expertise Description

I have more than 40 years experience in the field of Construction. My experience includes project oversight services; project monitoring and progress reporting; schedule and cost controls and analyses; troubled project turnaround services, effectiveness, and efficiency studies; commercial damages; and assistance with negotiations, dispute resolution services, and litigation support. I have prior expert witness experience.

Expert 343221 - OR

Expertise Description

I have more than 15 years experience in the field of Construction. My experience includes commercial estimating, structural engineering design, and construction management. My research includes seismic testing and calibration. I have prior expert witness experience.

Expert 374629 - CA(S)

Expertise Description

I have over 20 years broad based development experience in the field of construction. My primary focus consists of corporate level management as well as development team management at the project level, taking project from the infant stages of acquisition, through design and development, to completion and turnover. My experience includes field engineer, officer engineer, project engineer, design and construction manager, superintendent, project manager, director of development and construction. My consultations further include pre-acquisition and pre-construction feasibility, change order and claims preparation, cost estimating, financial damages, planning, organization, leadership, control, and administration. I have prior expert witness experience.

Expert 367890 - AL AK AZ AR BC CA(N) CA(S) CO CT DE DC FL GA HI IA ID IL IN KS KY LA ME MD MA MI MN MS MO MT NE NV NH NJ NM NY NC ND OH OK OR PA QC RI SC SD TN TX UT VT VA WA WV WY WI

Expertise Description

I have over 25 years experience in mechanical engineering with expertise in the design and project management of award-winning products for the medical, aerospace, amusement parks, medium and heavy industry fields. I am a detail-oriented professional with extensive expertise in all aspects of product design, from definition and analysis through conceptual design, drawings, presentations, fabrication and customer satisfaction. I have over 10 years expert witness experience.

Expert 354994 - AZ CA(N) CA(S) CO HI NY UT

Expertise Description

I have more than 25 years with extensive background in Architectural services. I specialize in waterproofing, building sites, site-work, building technology & diagnosis, peer review, and building code analysis. My additional services include commercial architecture, facility assessments, architectural assessment, architectural building testing and evaluation, and due diligence inspections. I manage design /build, construction, and design/bid/award delivery processes. I have worked in concrete, steel, and wood, particularly with wood-framed construction and building envelope design. I provide project management services as an owner's representative, construction manager (agent, advisor or at-risk), or quality control representative. I am experienced in managing each phase of design and construction, including the preparation of master plans, prioritization analysis, and pre-qualification procedures. I have over 20 years expert witness experience with consultations, depositions, and courtroom testimony.

Expert 354999 - AZ CA(N) CO HI NY UT

Expertise Description

I have more than 30 years experience as an expert consultant in a wide variety of construction-related fields. My expertise includes building sites, facility assessments, forensic inspections and construction projects, testing and evaluation, scheduling, construction estimate preparation, construction document peer review, site-work, site inspections, and evaluations; code and materials review, cost and scheduling/delay analysis, development and management of remedial design recommendations utilized for cost estimating, repair and design/build applications. I have worked on construction, remodeling, and remedial repairs on large single-family and multi-family residential projects, multi-family apartment and condominium complexes. I over 15 years of expert witness experience with consultations, deposition, and courtroom testimony.

Expert 349321 - CA(N) CA(S) NV OR TN TX WA

Expertise Description

I have more than 30 years experience in the field of Construction. My expertise includes commercial industrial, multi-family, single family, residential, hotel, retail, office buildings, medical, and all various aspects of construction. I am a developer and/or owner of numerous residential, commercial, and industrial construction projects. I have experience in planning, design review, cost of repair, permitting, financing, and leasing of projects. My consultations further include cost of repair and standards of care as an expert. I have also dealt with scheduling claims and cost accounting claims. I have over 20 years expert witness experience with consultations, deposition, and courtroom testimony.

Expert 324694 - CA(S)

Expertise Description

I have over 30 years of experience in architecture, engineering, and construction within the commercial, entertainment, and hospitality environments. I have forensic consulting experience with contracts; project design; details and planning; construction document analysis; and construction contract administration. My expertise includes architectural and construction defects, commercial Architecture, industry standard of care, scope of services, and building envelope design and failures. I am highly skilled at differentiating the responsibilities of owners, architects, and contractors, as well as managing client expectations. I have more than 5 years expert witness experience with consultations, deposition, and courtroom testimony.

Expert 320740 - FL

Expertise Description

I have more than 35 years experience in construction as a Professional Engineer (P.E.). My experience includes assignments in engineering, general contracting, real estate development, and consulting. My expertise includes: building inspections, construction defects, code compliance, construction claims, termite damage assessments, mold and indoor air quality investigations, and building maintenance evaluations. I have additional experience with condominium reserve calculations for new and converted condominium properties. I have 10 years expert witness experience with consultations, deposition, and courtroom testimony.