Construction Bids Expert Witness Irvine 325411

Expertise Description

I have over four decades of general contracting and construction experience. I have a working knowledge of breach of contract issues; building codes and interpretation; construction investigations; construction management; cost analysis; cost estimation; delay claims; destructive testing; repair bidding and implementation; site inspections; standard of care analysis; water intrusion investigations. I have experience working on a variety of property types including apartments; commercial/industrial sites; distribution and manufacturing facilities; hospital and medical facilities; multi-family dwellings; museums; public works; religious; retail; self-storage; and warehouses (mini). I have provided consultations, deposition, and courtroom testimony as a contraction bids expert witness for more than a decade.

General Contractor Expert Witness Arizona 536570

Expertise Description

I have worked in general contracting for more than two decades. My experience lies in building code research; construction defect forensic analysis; cost of repair estimates; contract disputes; delay analysis; failure and causation; forensic investigations and evaluations; general contractor standard of care; home and commercial building inspections; material mechanics; OSHA compliance and regulations; repair recommendations development; personal injury; and project audits. I have provided numerous clients with deposition, consultations, and courtroom testimony for over 15 years as a general contractor expert witness.

General Contractor Expert 55741

Expertise Description

As a third generation Southern California builder licensed since 1984 and a forensic expert since 1996 I have performed on projects ranging from food production facilities & manufacturing/office complexes, restaurants, medical center offices, and veterinary hospitals, to residential homes engaged in new construction, remodel/addition, hotels, common interest developments, HOA issues, Period re-authentication of classic home design, corrections to poor & defective work, and have addressed issues regarding most subcontractor trades associated with construction projects. I have successfully worked a half dozen such issues over the years related to condominiums/common interest developments regarding water intrusion from adjacent and upper level units.

As a tradesmen prior to becoming a contractor I worked in innumerable supermarkets and retail outlets conducting maintenance on refrigeration units, among other things.

I have also performed in matters related to my prior statement as well as premises liability, personal injury, standard of care, project administration, construction defects, moisture intrusion, fire, codes, contract issues, destructive testing, damage/repair cause & cost estimates encompassing all elements of losses to the complainant, and many contractor licensure transgressions that led to enhanced awards or a disgorgement. I am fully versed in both plaintiff and defendant matters, carrier defense & subrogation, quantum meruit issues including divorces, depositions, trial testimony in bench and jury hearings, mediation, arbitration, and moderating disputes pre-filing. I have offered my services as a general contractor expert witness for over 10 years.

Construction Management Expert Witness TX 532742

Expertise Description

I am an experienced construction management expert witness with more than four decades in the field. I have expertise in cost estimating and control, critical path method (CPM) schedule development and management, risk management, construction project management, work scope and budgets, cost overruns, excessive changes, schedule delays/acceleration, productivity impacts, and contractor standards of care. I have prior experience offering consultations, deposition, and courtroom testimony as a construction manager expert witness.

Construction Defect Claims Expert 519944 AL

Expertise Description

With over 30 years of experience in all facets of the Construction Industry, including over 20 years focused on disputes, contract negotiations and litigation. Whether as a manager of numerous complex projects or as as claims consultant in over 150 plus cases, ethical and fair dealing has remained the standard of my foundation. Ever conscious of schedule, cost and quality, I remain driven to provide the best possible result(s) for the stakeholders that I represent. I have worked for over 15 years as a construction expert witness and have provided numerous clients with consultations, courtroom testimony, and deposition.

Civil Engineering Expert 505195 AL

Expertise Description

I have more than 20 years experience in the construction industry focusing on healthcare, education, commercial and residential construction and renovations. My expertise includes front end planning, schedule/budget development and control, scope development, architect/engineer/contractor evaluation, RFP development, risk management, constructibility review, project phasing, value engineering, quality control and dispute representation. I have over 5 years experience as a safety and civil engineering expert witness in Michigan and have provided clients with consultations.

Buildings Construction Expert 518671 AL

Expertise Description

With more than 25 years experience in civil infrastructures, I have spent my career working with building systems, balconies, parking garages, bridge piers, and decks. I have additional knowledge in forensic and failure investigation and litigation support on building envelopes; roofing systems; balconies; pavements and runways; parking structures; as well as material testing, including concrete, aluminum, steel, anchor bolts and asphalt. Through investigation and engineering analysis, I am able to determine the causes of structural performance issues, such as structural distress, excessive displacement, or excessive vibrations to partial or total structural collapse. I have also spent over 25 years offering consultations, deposition, and courtroom testimony as a Buildings Construction Expert Witness in Illinois.

Construction Foundations Expert 519393 CA(S)

Expertise Description

My background of over 10 years in the field of Construction has been focused in general engineering, contracting, plumbing, building and safety issues, compliance, licensing and permits. I have additional knowledge in problems due to foundations and house lifting. I have provided consulting and deposition service as a construction expert witness.

Urban Civil Engineering Expert 519284 CA(N)

Expertise Description

I have worked as a civil and structural engineer for over a decade. I have extensive experience in the design of commercial, civic, retail, office and residential urban-infill projects and parking structures, as well as various institutional and essential services facilities. My expertise focuses on design of cast-in-place, precast, prestressed and post-tensioned concrete, steel, metal stud, wood and masonry structures. I have prior experience offering my services as an urban civil engineering expert witness.

Building Contractor Expert 321437 AZ

Expertise Description

I have more than 25 years of experience in Civil Engineering with multiple engineering emphasis such as: Soil, Transportation and Traffic, Architectural Design, and I am also a licensed General Engineer and Building Contractor. I have built and designed custom homes, highways and roadways, and traffic signals and interchanges. I have experience with traffic control, and also retaining walls, slope repairs, townhomes, apartments, single-family homes, expansions and retrofits, and railroad construction. I have expertise in the California Building Code, seismic retrofits, manual uniform traffic control devices, cost estimating, scheduling, highway design manual, traffic manual, and public works standard plans and specifications. I have more than 5 years expert witness experience with consultations, deposition, and courtroom testimony.

Construction Expert 505119 NJ

Expertise Description

I have more than 25 years experience in the field of Construction with expertise in evaluating general construction related issues and deficiencies. I am a specialist in evaluating water intrusion related construction issues. I have designed solutions to resolve construction problems in residential and commercial structures, and have experience with construction damage analysis and various slips and fall accidents and have researched applicable building codes and standards connected to these accidents. I have over 15 years expert witness experience with consultations, deposition, and courtroom testimony.

Construction Disputes Expert 326834 AZ

Expertise Description

I have more than 30 years experience with Construction Disputes & Public Bids. My expertise includes complex construction disputes in state and federal courts, including: mechanics’ lien; stop notice; surety bond; Miller Act claims; delay; disruption; default; personal injury; defect and policyholder insurance coverage claims; and public bidding process. I have prior expert witness experience with consultations, deposition, and courtroom testimony.

Construction Delays Expert 128245 FL

Expertise Description

I have over 30 years experience in real estate and litigation consulting. I have expertise in calculation of real estate damages resulting from construction delays, insurance claims, temporary takings, eminent domain, due diligence, and commission disputes. My expertise also includes: conducting market, marketability, and financial feasibility studies encompassing all aspects of real estate development (residential, office, retail, resort, and industrial properties); acquisition and investment analysis; highest and best use analysis; and adaptive re-use. I have experience in broker standard of care, commission disputes, broker responsibilities, broker malpractice, and broker ethics. I have more than 25 years expert witness experience with consultations, deposition, and courtroom testimony.

Construction Renovations Expert 159616 AZ

Expertise Description

I have over 25 years of experience specializing in development, design, and construction management for a wide variety of construction and renovation projects. My Expertise includes: multi-family residential, construction defects, condominium, structural, mechanical, electrical, plumbing, acoustical, architectural, roof, windows, finish carpentry, flooring, tile, concrete, stone, cost estimation, scheduling, budgets, government approvals, and the state fire marshal. My additional expertise includes: high-rise condominiums, hospitals, hotels, retail, malls, shopping centers, casinos, office buildings, mixed-use buildings, commercial, historic preservation, schools, university buildings, construction management, contract administration, project management, contracts, agreements, fee proposals, liability insurance, construction claims, and zoning. I have more than 20 years expert witness experience with consultations, deposition, and courtroom testimony.

Construction Management Expert 161329 IL

Expertise Description

I have over 50 years of experience in the construction industry with extensive experience in construction management and procedures, quality assurance, building envelope defects and failures, construction testing and evaluation, building envelope issues, concrete inspections, welding inspections, concrete pavement, concrete slabs, and quality control. I have more than 25 years expert witness experience with consultations, deposition, and courtroom testimony.

Hvac Expert 128222 CA(S)

Expertise Description

I have more than 20 years experience in the field of Commercial / Industrial HVAC (Heating, Ventilation, and Air Conditioning) and Refrigeration Systems. My areas of expertise consist of industrial electrical equipment and systems, security systems and security systems maintenance, power systems, HVAC controls, solar codes and standards, process cooling, temporary power, chilled water and compressed air plants, facility management, preventative maintenance, and non-destructive diagnostics, such as thermographic imaging, radiography, broadband, real-time radiography, vibration analysis, oil trend analysis, laser alignment, frequency and harmonics analysis, communication wiring, and voltage and current analysis. I have extensive experience with industrial boilers, steam piping, boiling, filtration systems and heat exchangers, as well as battery fires, and fire and explosion detection. I have 15 years expert witness experience.

Construction Delays Expert 128476 NJ

Expertise Description

I have over 40 years experience in Construction, Site-Work, Earthwork, Heavy Equipment, Grading, Underground Utilities, Construction Claims, Construction Delays, Change Order and Claims Preparation, Construction Equipment, and Construction Safety. I have more than 5 years expert witness experience with consultations, deposition, and courtroom testimony.

Forensic Accounting Expert 57976 TX

Expertise Description

I have over 25 years specializing in Forensic Accounting, with an emphasis on measurement of financial damages related to business interruption, business valuation, commercial litigation, construction claims, delays and defects, consequential damages, contractual disputes, economic damages, first party property claims, fraud and fidelity losses, insurance claims, intellectual property, inventory losses, marital dissolution or divorce, loss of earnings, loss of income or profits, partnership disputes, personal injury, product liability, property damage, shareholder derivative actions, shareholder disputes, subrogation, third party liability claims, unfair business practices, wrongful death and wrongful termination. I have prior expert witness experience with consultations, deposition, and courtroom testimony.

Real Estate And Construction Law Expert 8039 CA(S)

Expertise Description

I have over 35 years experience as an attorney specializing in real estate, business, and construction legal issues. My real estate expertise includes: acquisition / disposition / leasing of commercial, industrial / residential properties; boundary disputes; easements; foreclosures; insolvency and real estate; land use; real estate law; real property development / finance / transactions; and title insurance. Business expertise includes: asset / stock purchases; bankruptcy; business law; contracts; corporate reorganizations; forged documents; limited liability companies; mergers; partnerships; and business transactions. My construction law expertise includes: construction claims; construction defects; construction delays; and workers compensation. I have more than 15 years expert witness experience with consultations, deposition, and courtroom testimony.

Construction Repair And Remodeling Expert 51131 CA(N)

Expertise Description

I have over 30 years experience in commercial and residential construction, repair, remodeling, and claims. My expertise includes: construction management; financial analysis; forensic analysis of design- and construction-related subjects; delay analysis; scheduling; means and methods; preservation / restoration; cost / time estimation; structural repair of damages as a result of fire, water, and wind. I have prior expert witness experience consultations, deposition, and courtroom testimony.

Real Estate Broker Expert 56901 CA(S)

Expertise Description

I have over 35 years experience as a real estate broker and licensed general contractor, specializing in real estate transactions and construction matters. My real estate expertise includes: sales; leases; contracts; property management; foreclosures; economic analysis; disclosure; data research; habitability; standards of care; residential investment properties; and duties of agents / sellers / buyers. My construction expertise includes: building codes / violations; business loss; contract disputes; construction defects / damage; construction management; framing; inspections; mold; plumbing / piping; septic failure; plywood; research / records; roofing; roof systems; stigma analysis; and standards of care, in addition to geotechnical situations (land movement). I have more than 20 years expert witness experience with consultations, deposition, and courtroom testimony.

General Contractor Expert 51241 CA(S)

Expertise Description

I have 30 years experience in the construction industry with general contracting and consulting as a civil engineer, general contractor, and realtor. My background includes public works, libraries, commercial facilities, retail buildings, restaurants, residential projects, high rise residential buildings, and educational complexes, including surveying, structural design, structural performance, subdivision design, grading, street improvements, sewers, storm drains, and storm drain channel systems, as well as project management, time impact analysis, contract administration, scheduling, staff training, and O.S.H.A. My consulting / claims experience includes: mediation; claim preparation; litigation support; document research and analysis; contractual disputes; and claims avoidance advising. I have more than 10 years expert witness experience.

Residential Architecture Expert 47022 CA(S)

Expertise Description

I have over 20 years of professional experience in architecture specializing in commercial architecture and residential architecture, forensic architectural issues, architectural standard of care, and water intrusion failure analysis. My other areas of expertise include contractor delay claims, Americans with Disabilities Act (ADA), ADA analysis, mold remediation repairs, and course of construction claims disputes. I have more than 15 years expert witness experience with consultations, deposition, and courtroom testimony.

Construction Defect Expert 18726 CA(S)

Expertise Description

I have more than 30 years experience in the industries of general contracting and in real estate appraisal. My areas of expertise include construction defect analysis, construction claims and delays, construction management, cost estimating, Critical Path Method (CPM), code compliance, building inspection, standard of care, property appraisals specializing in diminution in value and other issues. I have over 20 years expert witness experience with consultations, deposition, and courtroom testimony.

Building Inspector Contractor Expert 12262 CA(S)

Expertise Description

I am a Building Contractor and Inspector with over 40 years of hands-on field experience. My areas of expertise include defective construction analysis, cost estimating, and construction scheduling and delays, as well as; plan and code compliance, document analysis, summaries and reports, evaluation of change order costs; estimates of repair for property loss from fire, flood, water and earthquake damage; construction management, on-site inspections, and project supervision.

Construction Bid Estimating Expert 8879 CA(N)

Expertise Description

I have over 50 years experience in professional estimating issues. My areas of expertise include definitive estimates, hard bid estimating, change order and claims settlements, and value engineering. I have more than 25 years expert witness experience with consultations, deposition, and courtroom testimony.

Heavy Construction Expert 8858 CA(N)

Expertise Description

I have over 30 years experience in design, field engineering, and construction and project management in power and industrial plants and heavy construction. My expertise includes construction contract formation and administration, development, and analysis of claims and construction problems including delays, errors and change orders, terminations, etc. I have specific experience in design and construction of electric power plants and industrial boilers including steam and combined cycle turbines, piping, valves, hydraulics and thermal problems, pumps, heat exchangers, and similar equipment. I have more than 20 years expert witness experience with consultations, deposition, and courtroom testimony.

General Contractor Expert 17804 CA(S)

Expertise Description

I have more than 35 years experience in the field of Construction with expertise in General Contracting. I have experience with apartment and commercial income property investments, contractor delay claims, real estate, personal injury, construction defects and injury investigation, scheduling, estimating, and claims analysis. I was the person responsible for safety both as an employee of the general contractor, and as owner of a construction company. I have over 20 years expert witness experience with consultation, deposition, and courtroom testimony.

Construction Expert 342800 AL

Expertise Description

I have more than 45 years experience in Design and Construction. I have experience designing large scale projects including: commercial, industrial, residential, motion picture and television studios, research & development facilities, health care facilities, public buildings, as well as restoration of historically significant structures. My areas of expertise include ADA compliance, disabled access, due diligence, development entitlements, building department processing/approval, code research, damage assessment, change order evaluation, contract disputes, construction failures, construction accidents, standard of care performance, professional performance review, construction mistakes and deletions, construction standards, building code corrections, roof leaks, roof failures, delayed construction, change order claims, construction documents review, project files examination, architectural and construction forensic opinions on existing, remodeled or proposed new project construction projects. I have provided consultations, deposition, and courtroom testimony as a construction expert witness for over 25 years.

Construction Expert 352397 CA(S)

Expertise Description

I have more than 25 years in the field of Construction. My areas of expertise include pre construction collaboration, claims consultation, hd project evaluations, concrete inspections, concrete restoration, construction procedures, repairs and project management. I have over 15 years expert witness experience with consultations, deposition, and courtroom testimony.

Built Environment Expert 349121 CA(N)

Expertise Description

I have more than 30 years of experience in mechanical engineering with expertise in the built environment. I have experience in large, technically demanding projects for advanced technology, health care, airport engineering, air infiltration, higher education, government, commercial and residential facilities. I have additional “hands-on” experience with the design, construction and operation of a wide array of extremely complex mechanical installations including process and manufacturing plants. I have over 5 years expert witness experience with consultation, deposition, and courtroom testimony.

Construction Safety Expert 450712

Expertise Description

I have more than 40 years of experience in Construction and Construction Safety with expertise in new construction, demolition, and renovation work for owners, construction managers, general contractors, and steel fabricators, including companies of regional, national, and international stature. I have worked on airports, bridges, casinos, convention centers, convocation centers, distribution centers, hospitals, hotels, manufacturing facilities, office buildings, paper mills, pharmaceutical plants, power plants, prisons, refineries, schools, stores, shopping malls, sports arenas, steel mills, and warehouses. I have experience in jobsite death, change order and claims preparation, the use of slips and falls protection systems and PPE, plus the use of hoisting equipment such as crawler cranes, truck cranes, carry-deck cranes, tower cranes, guy derricks, stiffleg derricks, Chicago booms, gin poles, monkey poles, winch poles, roustabouts, hoisting engines, overhead cranes, and forklifts. I have prior expert witness experience with consultations, deposition, and courtroom testimony.

Construction Project Management Expert 323643 CA(N)

Expertise Description

I have more than 40 years experience in the field of Construction with expertise in project management, pre-construction, design build and hard bid, estimating, contractor delay claims, contract administration and negotiation, contractual dispute, conflict resolutions, logistics, scheduling, field operations, site safety, production, cost control, commissioning, OSHA regulations, and closeout. I have knowledge in Heavy Commercial, Structural, Concrete Slabs, Cast-in-Place Concrete construction, with substantial background in Civil work, Structural Steel, Seismic Retrofit, most MEP installations and all Finishes as well as journeyman level knowledge in multiple trades (concrete, rough & finish carpentry, electrical, drywall and painting). I have over 25 years expert witness experience with consultations, deposition, and courtroom testimony.

Property And Casualty Insurance Expert 444937 AL

Expertise Description

I have more than 35 years experience in the field of Property and Casualty Insurance. Extensive experience in risk management, liability losses, contractor delay claims, program design, safety oversight, administration, claims handling, claims and loss damages, brokers errors and omissions, and property losses. My additional knowledge includes consolidating insurance programs for parent and subsidiary companies, funding techniques, insurance standard of care for agents and brokers, and structuring innovative solutions and alternatives. I have over 5 years expert witness experience.

Construction Dispute Expert 392771 OR

Expertise Description

I have more than 45 years experience in the field of Construction with expertise in construction dispute, claims and litigation, contract agreements and documents, project management, construction management, labor consulting, project constructability, project cost overruns, contract time delays, and quality control. I have additional knowledge of safety issues, general building and heavy engineering contracting, cost eliminating, subcontracting, labor production, project acceleration, change orders, and contracts and agreements. I also have experience with Critical Path Method (CPM) planning and scheduling, Earthwork and Site-Work, forensic analysis, and wastewater reclamation projects. I have over 40 years expert witness experience with consultations, deposition, and courtroom testimony.

Construction In Canada Expert 381187 BC

Expertise Description

I have more than 30 years experience in the field of Architecture and Construction. My experience includes contract drawings and specifications with an emphasis on technical quality, project management, construction management, project scheduling, water intrusion and envelope failure, construction delays, mold issues, and construction claims. My architectural experience has involved many types of buildings, including bus shelters, recreational centers, wood frame apartments, high-rise buildings, correctional facilities, educational buildings, major civic buildings, courthouses, college buildings, and single family homes. I have experience in construction administration. I have case experience in construction defects, fire investigation, construction delay claims, construction contract administration, and litigation avoidance.

Construction Expert 321797 CA(S)

Expertise Description

I have more than 40 years experience in the field of Construction. My experience includes project oversight services; project monitoring and progress reporting; schedule and cost controls and analyses; troubled project turnaround services, effectiveness, and efficiency studies; commercial damages; and assistance with negotiations, dispute resolution services, and litigation support. I have prior expert witness experience.

Construction Expert 343221 OR

Expertise Description

I have more than 15 years experience in the field of Construction. My experience includes commercial estimating, structural engineering design, and construction management. My research includes seismic testing and calibration. I have prior expert witness experience.

Energy HVAC Expert 350642 CA(S)

Expertise Description

I have more than 10 years experience in HVAC, plumbing and building energy conservation, system design, construction and forensic analysis. I have also worked by performing site inspections, testing, research, product analysis, and cost estimating. I have spent over 5 years offering my services as an HVAC expert witness.

Waterproofing Expert 354994 AZ

Expertise Description

I have more than 25 years with extensive background in Architectural services. I specialize in waterproofing, building sites, site-work, building technology & diagnosis, peer review, and building code analysis. My additional services include commercial architecture, facility assessments, architectural assessment, architectural building testing and evaluation, and due diligence inspections. I manage design /build, construction, and design/bid/award delivery processes. I have worked in concrete, steel, and wood, particularly with wood-framed construction and building envelope design. I provide project management services as an owner's representative, construction manager (agent, advisor or at-risk), or quality control representative. I am experienced in managing each phase of design and construction, including the preparation of master plans, prioritization analysis, and pre-qualification procedures. I have over 20 years expert witness experience with consultations, depositions, and courtroom testimony.

Construction Expert 354999

Expertise Description

I have more than 30 years experience as an expert consultant in a wide variety of construction-related fields. My expertise includes building sites, facility assessments, forensic inspections and construction projects, testing and evaluation, scheduling, construction estimate preparation, construction document peer review, site-work, site inspections, and evaluations; code and materials review, cost and scheduling/delay analysis, development and management of remedial design recommendations utilized for cost estimating, repair and design/build applications. I have worked on construction, remodeling, and remedial repairs on large single-family and multi-family residential projects, multi-family apartment and condominium complexes. I over 15 years of expert witness experience with consultations, deposition, and courtroom testimony.

Licensed Architect Expert 324694 CA(S)

Expertise Description

I have over 30 years of experience in architecture, engineering, and construction within the commercial, entertainment, and hospitality environments. I have forensic consulting experience with contracts; project design; details and planning; construction document analysis; and construction contract administration. My expertise includes architectural and construction defects, commercial Architecture, industry standard of care, scope of services, and building envelope design and failures. I am highly skilled at differentiating the responsibilities of owners, architects, and contractors, as well as managing client expectations. I have more than 5 years expert witness experience with consultations, deposition, and courtroom testimony.

Construction Expert 320740 FL

Expertise Description

I have more than 35 years experience in construction as a Professional Engineer (P.E.). My experience includes assignments in engineering, general contracting, real estate development, and consulting. My expertise includes: building inspections, construction defects, code compliance, construction claims, termite damage assessments, mold and indoor air quality investigations, and building maintenance evaluations. I have additional experience with condominium reserve calculations for new and converted condominium properties. I have 10 years expert witness experience with consultations, deposition, and courtroom testimony.