Locate a highly qualified Time Impact Analysis expert witness for your litigation or insurance matter. For over two decades, ForensisGroup provides clients with trusted experts in Time Impact Analysis to testify on industry specific issues. Our experienced professionals have been assisting legal and insurance professionals in finding well-qualified experts through out the United States. Contact us immediately to request the right expert or consultant for your case.
Environmental Economist Expert 531330 VT
Expertise Description
I have spent over two decades working as an environmental economist. I specialize in tourism economics, environmental benefit/cost analysis, sustainable economic development, environmental valuations, tourism and hospitality growth planning, policy analysis, governance capacity building, water and energy policy, urban planning, government budgeting, and post-conflict economic development. I have provided courtroom testimony, consultations, and deposition for more than 20 years as an environmental economics expert witness.
Failure Analysis Expert 56035 MA
Expertise Description
I have over 35 years experience in the field of Failure Analysis. I have experience in engineering failure analysis, chemical analysis, mechanical fabrication, and other areas. My expertise includes: engineering investigations, fires and explosions involving industrial/commercial/household equipment, including tanks and pressure vessels, reactors, residential and commercial boilers and hot oil heat transfer systems, furnaces and ovens, heaters, kerosene heaters, lighters, gaseous leaks, fuel volatility and contamination, tank trucks, propane, etc.; vehicular accidents involving rollovers, rear-enders, sudden pullouts, jack-knifes, pedestrian impacts, pedestrian collisions, back-ups, lost cargo, road debris, and low-hanging wires; mechanical failures involving bolts, threaded connections, bolted and unbolted tanks, pressure vessels, hydraulic systems, cryogenic tanks and lines, pumps and valves, protectors, ladders, hoists, scaffolds, etc. I have more than 30 years expert witness experience with consultations, deposition, and courtroom testimony.